Civil works for 100” GRE pipeline replacement project at Sohar refinery

It involves excavating and exposing existing 100” sea water intake and 28” Fire water pipe line, 50 meter each, 150mm layer by layer filling and installation, deep well dewatering system installation, site facility installation and operations and back filling and clearing