top of page
OQ

Construction of MCC / Industrial Buildings at Salalah Port, Part of Jetty revamping of oil pier jetty, Orpic Client

  • It involved the creation of a raised floor control building specifically designed for the oil and gas industry. It required a highly specialized approach due to the complexity and safety requirements inherent in oil and gas infrastructure.

  • The construction of the raised-floor control building was a multidisciplinary task, involving the integration of various engineering disciplines, including civil, electrical, and mechanical engineering.

bottom of page