top of page
OQ
Construction of MCC / Industrial Buildings at Salalah Port, Part of Jetty revamping of oil pier jetty, Orpic Client
It involved the creation of a raised floor control building specifically designed for the oil and gas industry. It required a highly specialized approach due to the complexity and safety requirements inherent in oil and gas infrastructure.
The construction of the raised-floor control building was a multidisciplinary task, involving the integration of various engineering disciplines, including civil, electrical, and mechanical engineering.
bottom of page