OCB PIT SHED-Fabrication & Erection (3 Weeks)
The OQ OCB PIT SHED-Sohar port was fully fabricated and erected within an accelerated timeline of just three weeks, delivered with a high level of precision and adherence to engineering standards. The scope of work included detailed shop fabrication, material preparation, cutting, welding, and surface finishing, followed by on-site assembly and erection. All activities were executed under strict quality control procedures to ensure dimensional accuracy, structural integrity, and compliance with client specifications.
Despite the tight schedule, the team coordinated effectively with procurement, site logistics, and safety departments to ensure uninterrupted progress. The project was completed safely, without incident, and handed over to the client on time, demonstrating our capability to deliver fast-track structural works with exceptional craftsmanship and reliability.