Forges Tardieu

Prefabrication, painting and erection of piping for Oman sugar refinery Project, Sohar

  • It includes various processes such as Prefabrication of piping – welding with nitrogen purging, field welding with nitrogen purging, erection of piping including hydrotesting, secondary support fabrication, painting and erection, Installation and dismantling of temporary supports.

  • Welding Stainless Steel – 80,000 Inch Dia

  • Welding Carbon Steel – 36,000 Inch Dia

  • Erection – 150,000 Inch Meter