Jindal Shadeed Iron and Steel LLC
Technological structure, equipment and piping Erection of 2x300 TDP Lime and Dolo Plant
Successfully executed the erection of technological structures, equipment, and piping for the 2x300 TDP Lime and Dolo Plant
It involved technological structure erection of 300 ton , equipment erection of 1500 Ton , Silo erection of 400 Ton and belt and bucket conveyor erection of 14 number
It also involves utility piping of 50,000 inch Dia, Hydraulic piping of 3000 Inch Dia and Roof and side Cladding